Helical Staircase
Commissioned by: Arminhall engineering
Main contractor: ISG
Team of: 6
Duration: 8 weeks
We erected sphere first and then lifted and installed all the pieces using secured chain blocks once the staircase was bolted in position we completely welded the staircase to which the welds were professionally tested & passed. From there we prepped the staircase using various filling techniques to allow us to spray the staircase on-site.